|
Taming the Tide - protecting the community.
London was at risk of being flooded by the Thames, until the construction of the Thames Barrier at the Woolwich Reach section of the river.
Costain, the lead contractor achieved this by sinking 9,000 tonne cill units onto the bed of the Thames between the massive piers that have become a London landmark.
|